News archive

17 Jan 2022 , Press release

Toro™ LH209L is a proven performer and a robust low-profile loader, designed to deliver in extremely demanding applications with limited heights. In response to customer needs and to further improve the loader performance and serviceability, Sandvik introduces several updates to its 10-tonne class low-profile loader while simultaneously adding it to the Toro™ loader and truck family as the first low-profile model.

4 Jan 2022 , Press release

Sandvik Mining and Rock Solutions has received a major order for the AutoMine® load and haul automation system valued at about SEK 250 million from the Chilean mining company Codelco, to be used in the El Teniente mine. In addition, aconnected load and haul equipment order, with an initialvalue of SEK 150 million, was received, bringing the total value of the orders to SEK 400 million. Both orders have been booked in the fourth quarter 2021.

29 Dec 2021 , Press release

Sandvik Mining and Rock Solutions has been awarded a contract in the EMEA region valued at around SEK 1 billion for the supply of tunnelling equipment, roadheaders and underground drill rigs. The order has been booked in the fourth quarter 2021 and delivery of the equipment is scheduled from the fourth quarter 2022 until the first quarter 2024.

23 Dec 2021 , Press release

Mississauga, Canada: Sandvik Mining and Rock Solutions has won an 18.5 MCAD order for surface mining equipment from Newcrest in Canada that will optimize reliability and productivity. Automation ready, the surface and rotary drills will be used at the open pit copper and gold mine currently in production.

15 Dec 2021 , Press release

Sandvik Mining and Rock Solutions has finalized plans to open a nearly 40,000 square-foot facility to support its customers in Western Canada with local parts storage, a workshop for components, and customer service support.

14 Dec 2021 , Press release

LKAB, operator of the world’s largest underground iron ore mine, will trial a Sandvik TH550B battery-electric truck and Sandvik LH518B battery-electric loader in northern Sweden. Sandvik Mining and Rock Solutions and LKAB will partner for a 12-month collaborative trial of the third-generation battery-electric vehicles (BEVs) under the mining company’s project to set a new world standard for sustainable underground mining.

9 Dec 2021 , Press release

On 6th December (date), Sandvik Chile obtained IE seal certification from IMELSA, validating it as a company that utilizes 100% renewable energy and establishing its as one of the forerunners in this field at national level.

8 Dec 2021 , News

Perenti’s Barminco, Newtrax and Sandvik are partnering to develop a new technology-led solution that improves the safety of pedestrians working near heavy vehicles (HVs) underground

2 Dec 2021 , Press release

Sandvik has signed an agreement to acquire Australian-based Deswik, the leading and fastest growing major provider of mine planning software. Deswik will be part of a newly formed division Digital Mining Technologies within business area Sandvik Mining and Rock Solutions.

24 Nov 2021 , Press release

Boliden’s Garpenberg zinc operation in Sweden will become the first mine in Europe to trial Sandvik LH518B. Sandvik Mining and Rock Solutions and Boliden have agreed on a 12-month collaborative trial period for the new 18-tonne battery-electric loader.

Go to page: 1 (This page) , 2 , 3 , 4 , 5 , 6 , 7 , , 47 Next